Vacuum Pump Protocol
1. Procedure
Section titled “1. Procedure”- Ensure all valves are in neutral position or closed.
- Includes pump t-valve, vacuum desiccator t-valve, and vacuum oven valves
- Turn on pump.
- Direct the vacuum by turning the pump t-valve to the PUMP direction.
- Open the vacuum valve of the vacuum over/vacuum desiccator.
- Wait at the pump until the built in vacuum pump gauge reads solid green.
- Close vacuum valve.
- Bleed the pump by turning the pump t-valve towards the BLEED direction.
- Turn off the pump.
- Ensure all valves are in neutral position or closed.