Skip to content

Vacuum Pump Protocol

  1. Ensure all valves are in neutral position or closed.
    • Includes pump t-valve, vacuum desiccator t-valve, and vacuum oven valves
  2. Turn on pump.
  3. Direct the vacuum by turning the pump t-valve to the PUMP direction.
  4. Open the vacuum valve of the vacuum over/vacuum desiccator.
  5. Wait at the pump until the built in vacuum pump gauge reads solid green.
  6. Close vacuum valve.
  7. Bleed the pump by turning the pump t-valve towards the BLEED direction.
  8. Turn off the pump.
  9. Ensure all valves are in neutral position or closed.